Drawing up a monitoring plan in 6 steps

Category: Practice

From risk analysis to reporting: the steps to a sound monitoring plan.

The six steps

A good monitoring plan starts long before the first measurement. We always follow the same structured approach:

  • 1. Risk analysis — which structures are at risk, and why?
  • 2. Measurement strategy — choice of technique(s): total station, GNSS, sensors, drone.
  • 3. Measurement plan — location and number of monitoring and reference points, frequency.
  • 4. Thresholds — attention, alarm and intervention levels, aligned with the engineer.
  • 5. Zero measurement — careful reference measurement before works begin.
  • 6. Follow-up & reporting — continuous monitoring, alerts and periodic reports.

Why a plan?

A well-considered plan prevents measuring too much or too little. It ensures the right points are monitored at the right frequency, and that everyone knows what to do when a threshold is exceeded.

← Back to knowledge base

Contact

Contact us

Tell us about your monitoring project. We usually reply within one business day.

* Required field